Mechanical and electrical installation, commissioning and relocation of bottling, packaging and palletizing systems across Europe. Engineered for uptime.
From greenfield commissioning to brownfield retrofits — we cover every stage between blueprint and bottle.
Full mechanical assembly of filling, labeling, conveying and palletizing lines. Compliant with manufacturer specifications.
Cabinet wiring, sensor integration, PROFINET / IO-Link commissioning. Hand-over with full documentation.
Cold tests, hot tests, performance qualification. Product-specific parameter tuning. SAT support 24/7.
Decommissioning, transport, reassembly and re-commissioning during scheduled production windows.
OEE upgrades, format conversions, retrofits to extend equipment lifecycle and meet new product requirements.
Preventive maintenance, spare parts, on-site response within 48 hours. Annual service contracts available.
On-site assessment, scope definition, risk register. Output: signed-off scope of work and detailed Gantt schedule.
Crew dispatch, tooling logistics, safety briefings, IBWR documentation. Site office set-up if required.
Foundations, frames, drives, conveyors. Geodetic alignment. Daily progress reports to project owner.
Cable routing, panel installation, sensor wiring, PLC integration with manufacturer's commissioning team.
Functional tests, performance runs, product trials. Documentation, training, final acceptance protocol.
KEMEX delivered the line ahead of schedule and within scope. Their crew worked seamlessly with our internal commissioning team — exactly the kind of partner you want on a tight timeline.
Send us your line specification and timeline. We respond with a detailed quote within 48 hours.